Front View 1. Right crossbar 2. Scale ruler* 3. Set screw* For securing the positioning plate. When released, the positioning plate (7) can be moved along the sliding rail freely. When unfolding the right / left crossbar, please tighten the set screw to prevent the positioning plate (7) from sliding, as this could result in injury. 4. Scale indicator* 5. Safety snap lock* Locks / unlocks the crossbar. When unlocked, the crossbar can be folded for easy-to-carry. 6. Sliding rail for positioning plate* 7. Positioning plate* For securing the target boards / target board extension rod. There are two BIG holes and two SMALL holes available on the positioning plate.
Before shipment, each BIG hole is pre-installed with one magnet for attaching the metal plate on the target board and each SMALL hole is preset with one hanging nail for securing the target board or the target board extension rod. When installing the target board or extension rod, align the mounting holes with the two small holes and attach it onto the hanging nails. 8. Positioning plate / Magnetic laser fix-plate For securing the pattern boards / attaching the cross laser module. When installing the big pattern board, 14 www.topdon.com