Section 5—Installation 5.1 Pre-Installation Inspection When unpacking, please carefully confirm the following points: ● Whether the accessories are missing according to the packing list. ● Whether there is any damage during transportation. ● Whether the model and specification of the machine's nameplate are consistent with the order requirements. If any damage or missing parts are found, please do not start the installation, and contact us as soon as possible. Please keep the packing box and packing materials for 1 month for future handling. The paper packaging is recyclable.
5.2 Pre-work Preparation When transporting or moving the EV charger, pay attention to the following points to ensure product safety: This product is electrical equipment. It should be handled with care, avoiding violent vibration and impact. The charger shall not be transported by dragging the charging connector and the charging cable. In order to ensure the long-term stable operation of the product, it is recommended to avoid installing chargers in extreme weather, especially as low or high ambient temperatures may affect the installation effect due to thermal expansion and cold contraction. The electrical power supply socket (NEMA 14-50R) must be prepared. Space requirement:
When the charger is fixed on the wall, the minimum space requirements are shown in Fig. 5.2. (Only for hardwired installation) It is suggested that the charger should be installed in a place with good ventilation, no direct sunlight and shelter from wind and rain. In order to ensure good ventilation, mount the charger vertically with clear space around all sides. 200mm (min) 200mm (min) 200mm (min) (Only for hardwired installation) ≈1200-1400mm Fig. 5.2 Minimum space requirements for wall mounting 17