Topdon — PulseQ AC Home User Manual US Online Version (EN)

Crimp the service wiring with the crimping plier (See Fig.5.6.7) 7. L1 L2 PE Fig. 5.6.7 8. Pass through the service wiring from the right bottom hole. (See Fig. 5.6.8) L1 L2 PE Fig. 5.6.8 9. 10. Ensure the service wiring can easily reach the connectors on the charging station’s input terminal block. Fully insert the wires into the connectors on the terminal block with the ground wire on the right. Tighten the screws with a torque of 1.8 Nm. (See Fig. 5.6.9) L1 L2 PE Fig. 5.6.9 25