INSTALLATION Your game was shipped from the factory A brief inspection is suggested before carton. If there is damage the carrier for claim purposes. damage to the cabinet and/or After the carton has machine or been carton. Examine the interior of the Make sure the in their sockets, mounted it will be required for game Unless volts otherwise the could indicate possible the freight for inspected, disconnected (CPU, etc. EPROM, Record reference and the remove wires, etc.) game the cables, devices serial are number servicing. REQUIREMENTS specified, this game is set to operate at 110 are AC.
Power cluded in supply this chassis schematic For efficient that the voltage on place a meter across +5.0 volts If necessary, adjust the screwdriver between 4.9 and so check this, connector. the and parts list the power supply in- meter reads operation SUPPLY most be set so information manual. POWER supply from components. electronic ELECTRICAL removed contact satisfactorily shipping is condition. carton, damage electronic the securely the machine shipping External from harnesses. since to in ready-to-play the of this board game, is +5.0 and 5.1 should volts, + 0.1 volts. ground at edge control volts. the on the power To