Downloaded from https://www.everyspec.com MIbHDBK-683(AT) 5-3-2-3 ~- Ikpending on the circumstances, the purchasing department should notify suppliers of the audit and arrange to have the appropriate pereonnel on hand during the audit. For internal audits, notification can b aocompliahed on the day of the -it by the team leader but two weeks notification should be provickd for an audit of a new supplier. The activity being audited should be prepared to oonduot a plant tour for the audit team and arrange to have the supervisors and operatore of the area available to answer questions from the audit team.
After the tour, the audit team should meet with manag~nt representatives fxxm the supplier being audited to wnduct a joint review of their findings. ho~tib, ~lier personnel capable of answering questions on those subjects akuld also be ma& available. 5-3-2.4 EhUiQUE- Ontheday of theaudit, themtit team shouldbe introduced to the ama personnel and their supervision. T’hearea ~~ 1 should be instructed to follow their normal operating procedures and answer questions from the audit team. The audit team should uee the System and Process Audit ~klisti, figures 10-5 through 15-5, during the tour to record their observations as acceptable, marginal or unacceptable for each of the elements listed. G .
After completing the plant tour, the audit team should meet with supplier ~nt repreeentatives. An acceptable format for the review is for the audit team to present their findings to the supplier and to have the supplier present their assessment of the same items based on having responded to questions posed before meeting with the audit team. This fomat has the advantage of getting to the heart of anY differences which may exist, but may run the risk of creating more conflicts than a jointly negotiated evaluation for each item. The act-l fo-t ~ be selected during the plant tour by the audit team based on their assessment of the relationship which forms.
5.4 ~ ~ During the review, any discrepancies or issues which are identified should be documented for follow-up action if a resolution cannot be reached during the review. The team chairman should establish a schedule for resolution of any action items which result from the review. Items corrected on the epot need to be documented and a commitment obtained from the supplier to review his o~rations for similar items and correct them.
In addition to reviewing the supplier-s general SFC implementation,this joint review should be used to establish specific SFC criteria for the ~-* ~t- If the supplier is a potential source of individual parta or as8eabliea, the audit teem should be prepared to point out the drawing or specification elements which are deemed candidates for WC control chart monitoring. The supplier should be prepared to generally discuss his approach to tiplementti SW on those elements. .. 62