TEPLODOM — Front Mounted

Installing the Condenser Front Mounted Important: See Section 4 - Unit Installation Standards and Procedures in the Thermo King Vehicle Powered Truck Installation Standards and Procedures Guide (TK 56430). THESE PROCEDURES MUST BE FOLLOWED! 1. Attach supplied foam insulation to rear of condenser as shown. 2. Position condenser onto front of cargo box and install mounting hardware as shown. a. Tighten hardware to 26.5 ft-lb. (36 N•m). 3. Reinstall electric box cover and reattach “Power Off Device” connector. 4. Route electrical harnesses through access hole in condenser frame and into cargo area. Figure 3. Front Mounted Condenser Shown RCS1679 TK 56881-18-IM-EN 15