Page 10 of 190 Report No.: 6068396.50 TRF No. G99/1-4_V1.0 G99/1 Clause Requirement - Test Result - Remark Verdict Info. 6.1.6 Interaction with the NETSO P 6.1.6.1 It should be noted that if the Registered Capacity of all Power Generating Module (synchronous together with asynchronous) on one or more sites in common ownership is >50 MW, then the Generator becomes licensable. Info. 6.1.6.2 Generators with an agreement with the NETSO may be required to comply with applicable requirements of the Grid Code. Where Grid Code requirements apply, it is the Generator’s responsibility to comply with the relevant parts of both the Distribution Code and Grid Code. P 6.2 Application for Connection P