Page 12 of 190 Report No.: 6068396.50 TRF No. G99/1-4_V1.0 G99/1 Clause Requirement - Test Result - Remark Verdict 6.2.2.3 The planned commissioning date stated on the application form shall be within 10 working days and 3 months from the date that the application is submitted to the DNO. Confirmation of the commissioning of each Power Generating Module shall be made no later than 28 days after commissioning (where tests and checks are not witnessed). Confirmation shall be provided in a format as shown in Form A3-2 (Annex A.3).

In addition to Form A3-2, an EREC G100 Export Limitation Scheme Installation and Commissioning Tests form shall be submitted to the DNO to confirm that the Export Limitation Scheme meets the requirements set out in EREC G100. Confirmation shall be provided in a format as shown in EREC G100 Appendix B. N/A 6.2.2.4 Note that a number of sections of EREC G98 do not apply to Electricity Storage devices that are covered by this procedure. Refer to Appendix 1 of EREC G98 for details. N/A 6.2.3 Power Generating Facilities which include Type A Power Generating Modules Type B C D Power Generating Modules.

N/A 6.2.3.1 For Type A Power Generating Modules the compliance, testing and commissioning requirements are detailed in Section 16 of this EREC G99. Type B C D Power Generating Modules. N/A 6.2.3.2 The Generator should apply to the local DNO for connection using the DNO’s Standard Application Form (available from the DNO’s website). On receipt of the application, the DNO will assess whether any Distribution Network studies are required and whether there is a requirement to witness the commissioning tests. In some cases studies to assess the impact on the Distribution Network may need to be undertaken before a firm quotation can be provided to the Generator.

On acceptance of the quote, any works at the connection site and any associated facilitating works will need to be completed before the Power Generating Module can be commissioned. On successful completion of the commissioning tests, the DNO will sanction permanent energisation of the Power Generating Module in accordance with Section 16 of this EREC G99. N/A 6.2.4 Power Generating Facilities which include Type B, Type C or Type D Power Generating Modules Info. 6.2.4.1 The connection process is similar to that described in paragraph 6.2.2 above, although detailed system studies will almost certainly be required and consequently the Generator might need to provide additional information.

The information should be provided using the Standard Application Form (generally available from the DNO’s website). The data that will generally be required is defined in the Distribution Code, Data Registration Code (DDRC), Schedules 5a, 5b and 5c. Info.