voyah — Эксплуатационное руководство по системе новой энергетической передачи (EN)

5-16 Electric drive system 5. New Energy Power System 5.2.3 Front electric drive system 5.2.3.1 Removal and refitting of front drive motor assembly (REV) Removal procedure NOTE - Take note of warnings and instructions for maintenance of the HV system. For details, refer to 5.5.1 Warnings and instructions for operations related to HV electronic control system. - Before removing the front drive motor assembly, drain front drive motor coolant and brake fluid CAUTION: - For the lifting operation of the vehicle with air suspension, please refer to the precautions in the chapter and the disassembly & assembly and maintenance chapter of front/rear air springs.

- After adjusting the body to the standard height, touch the maintenance icon on the touch screen to adjust the system to the maintenance mode; 1. Turn off all electrical appliances and turn off the start switch. 2. Open the engine hood. 3. Remove the engine compartment trim panel. 4. Disconnect the battery negative terminal. Refer to 3.1.6.1 Maintenance and inspection battery 5. Discharge front drive motor assembly lubricating oil (refer to 3.1.4.11 Change of front drive motor assembly lubricating oil ) 6. Remove wheel assembly. 7. Remove front subframe assembly (refer to 6.7.12.6 Removal and refitting of front subframe assembly (REV - facelift) ) 8. Remove front drive motor. VOYAH FREE