Department of the Army AR 70-62 — Army Regulation AR 70-62 Airworthiness Qualification of U.S. Army Aircraft Systems Manual PDF

Downloaded from https://www.everyspec.com SUMMARY of CHANGE AR 70–62 Airworthiness Qualification of U.S. Army Aircraft Systems This revision-- o Incorporates risk management provisions and references Army Regulation (AR) 385-16 for risk acceptance (para 2-6). o Adds description of contractor flight release complementing DLAM 8210.1/AR 95-20/AFR 55-22V1/NAVAIRINST 3710.1C requirements (paras 2-1, 3-5, and 3-6). o Adds limits for continued airworthiness to prescribed limits (para 3-7). o Clarifies user-requested modification policy and responsibility (paras 1-4, 2-7). o Describes interfaces with AR 95-1 (paras 2-6, 3-7).

o Provides current addresses and is reformatted to current publication practices. o Adds operation of carry-on equipment with airworthiness impact (paras 1-4, 2- 1, and 2-7). o Adds airworthiness assessment of commercial off-the-shelf equipment (paras 1-4, 2-1, and 2-7). o Adds a glossary and index. o Adds appendix B figure showing airworthiness process elements to provide a visual reference.