DISASSEMBLY 2) Set master link on track link press jaw Master link disassembly. 3) Press master link pin out. Punch small plug into oil hole of the pin after disassembly. No need to remove large plugs. It can be done before disassembly, but oil will be spreaded out on the floor. # Do not give any damage on master link connecting surface. Regular link disassembly 4) Check alignment between center of pushing tools and pin and bushing, then push pin and bushing out at the same time. Banging sound will be occurred at breakage of edge ring, which is normal. # Press fit portion of bushing and pin nor link bore will be damaged if it was misaligned.
Required Link Press Capacity 5) Take a disassembled link out - 9 - Model Press capacity D475A and up 300 ton and up D375A and below 200 ton and up