F3B ENGINE 219 T RAKKER E URO 4/5 PRINT603.93. 641/A Figure 201 SCHEME OF SCREW SECURING 117543 Screw screws (1 - 2 - 3) until contact relating seats on cylinder according to sequence indicated steps as indicated in successive to pipe (1) corresponding to both on cable and on pipe. Figure 202 Lock the screws - 1 st phase: tightening to a torque of the torque wrench (1). - 2 nd phase: closing with an 99395216 (3). Figure 203 71776 the direction of rotation of the tool, turn the flywheel of combustion. when the hole with one after the hole with two the inspection window (2).
- Mount the engine brake - to the cylinder with Print 603.93.641/A Base q November 2006 Revi - June 2007 1 70567A TENING SEQUENCE CKER ARMS ocker arms are brought to U er head, tighten the screws w d in figure operating in two igure. C 116722 ocker-arm shaft as follows: rque of 80 Nm (8 kgm) with angle of 60 using the tool A 117548 er retaining springs (3). ngine brake cylinders (4) and ne brake solenoid valve (1). Figure 204 se strips (2) to fix cable (3) hite color notches machine amshaft timing Figure 205 pply tool 99360321 (7) and NOTE The arrow shows t engine when runnin Using the above-me (1) in the direction o take the piston of cyl T.D.C.
in the phase This condition occ reference mark (4 reference marks (5) be seen through th