Acquire Image Tool Properties The belt control has 3 different modes of operation: l Do not control the belt : The I/O signals defined in the Belt editor are not used. l Leave the belt always on : When the process manager starts, the belt will be turned on and will remain on. l Control the belt : When the process manager starts, the belt will be turned on and off based on the product flow through the system. When the Control the belt option is selected, the belt will be turned off based on the product flow for a selected robot. A typical configuration would look like this: ACE Reference Guide, 18317-000 Rev A Page 655