Downloaded from https://www.everyspec.com ADS-39A (HDBK) 3.2.6.1 The candidate alternate source shall certify that they have legal possession of all master gears required for the manufacture and inspection of bevel gears, as well as those required for calibration purposes. All master gears utilized shall be calibrated with appropriate higher-level master gears held by the original manufacturer of the component. The Government will not supply any master gears of any level to candidate alternate sources. Bevel gears are identified in Attachment 1.
3.2.6.2 The candidate alternate source shall certify they have all equipment required for the manufacture, inspection (including roll checks), and calibration of bevel gears, including Zeiss (or equivalent) gear inspection equipment. The specific equipment to be used shall be provided in the manufacturing plan (see 3.2.5 above). 3.2.6.3 The candidate alternate source shall certify that they have legal access to all required prime manufacturers’ gear manufacturing/inspection specifications, or have an ATCOM- approved alternate specification.
3.2.6.4 The candidate alternate source shall provide detailed master gear calibration plans, including certification of the current calibration status of master gears used in the manufacturing process. Certification of the calibration status of all master gears shall be provided to the Government. 3.2.7 Approval 3.2.7.1 Source Approval shall be based upon review and acceptance by the Government of all data required above, and review of the Source Approval Request against the requirements of the CASL Instructions. Upon approval, all manufacturing and inspection plans shall become "frozen,” and shall not be changed without first obtaining the Government’s approval.
Test components shall be manufactured in accordance with these plans. 3.3 Engineering Test 3.3.1 General 3.3.1.1 The candidate alternate source shall supply all parts required during the engineering test, inspection, and evaluation process. 3.3.1.2 The candidate alternate source must provide certification that all components submitted for test, inspection, and evaluation have been manufactured/assembled in accordance with the approved “frozen” planning. 3.3.2 Inspection and Test 4