Hino — Cable Adjustment (PTO Side)

POWER TAKE OFF 00-23 Legend 1. Bolt 2. Lock nut 3. Special nut Operability of the dump lever, rise of the body (car- go deck), and inspection and adjustment of the rise and fall reference times 1. Check that the engine revolution per minute is 1,250 rpm and the rise and fall operations of the body (cargo deck) are performed within the follow- ing reference times. NPA0049E Legend 1. PTO 2. Counterclockwise rotation 3. Clockwise rotation 2. Inspection of the dump lever control force and moderation Inspect that the operation of the dump lever can lightly and smoothly be performed. Basic Value (On the Dump Lever Knob): 10 kgf (98 N) 4.

If the cable is adjusted in the aforementioned meth- od and the amount of spool extrusion cannot be obtained, repeat Items (2) and (3) and adjust the cable so that the amount of spool extrusion will reach a specified extrusion dimension. 5. If a spool extrusion dimension can be obtained, tighten the cable holder tightening bolt and lock nut at a specified torque in this order. When the dump lever is in the “Up” and “Down” positions, inspect that the lock operation can be performed without a feeling of physical disor- der. 3.

After having repeated the “Up” and “Down” posi- tions of the dump lever and slowly set them to the “Down” position as much as possible, inspect the shaft (driving shaft) between the PTO and oil pump. Tighten: Cable holder bolt to 23 N m (2.3 kg m / 17 lb ft) Lock nut to 21 N m (2.1 kg m / 15 lb ft) Inspect that the shaft (driving shaft) rotates for- ward or backward. If the shaft slowly rotates backward, it is nor- mal. NPA0050E NPA0051E Rise Time And Fall Time Sec. Rise Fall Single Cab within 20 within 20 Double Cab within 25