00-40 POWER TAKE OFF Legend 1. Oil pump 2. PTO 3. Bolt Installation Notice: Before installing the PTO, cleanly remove the liquid gas- ket left on the PTO installation side of the transmission case and clean and degrease the transmission case by waste cloth so that oil will not adhere to it. 1. PTO (with Oil Pump) After having cleaned and fully degreased the transmission installation side of the PTO, coat it with liquid gasket (LOCTITE 17430 or equiv- alent). NPA0074E Legend 1. Left frame 2. High-pressure hose 3. Low-pressure hose 4. Wire 5. Truck front 9. Bolt (PTO) 10.
PTO (with Oil Pump) Remove the six tightening bolts around the PTO and remove the PTO (with oil pump) from the transmission. Notice: If the high-pressure hose could not be removed in Item 8 described previously, remove the PTO (with oil pump) from the high-pressure hose rotating the PTO at this time. Besides, because this PTO (with oil pump) weighs 15 kg (147 N), be fully careful of its drop at attachment and de- tachment. NPA0090E Legend 1. Apply liquid gasket Notice: When removing the PTO side from the high-pressure hose rotating the PTO side at PTO (with oil pump) re- moval, install the PTO (with oil pump) in the high-pres- sure hose and lightly tighten it. 2.
Bolt (PTO) Install the PTO (with oil pump) in the transmis- sion and tighten the bolt at a specified torque. Tighten: PTO bolt to 45 N m (4.6 kg m / 33 lb ft) NPA0089E