Assembly Procedure PC8000 Be sure to observe the instructions in the “Assembly Procedure Manual“. Lifting gear, tools and other suspension systems must be in good condition and of sufficient lifting capacity. Be sure hydraulic cylinders and attachment components are properly supported from hoist and securely remove, before removing supporting pins. Floors must be clean and dry. After draining operations be sure all spillage is cleaned up. Electric energy W All work on medium and high voltage systems has to be carried out by authorized Electricians having the permission to work on medium and high voltage systems.
All safety devices requested by the National Safety Administration must be available and used for work on the medium and high voltage systems. Required MANPOWER Average assembly and commissioning time schedule* * Dependent on mine conditions (shifts, weather, ...) PC8000AS rev 02.doc 7 Edition 01/2004 Diesel drive Electric drive Customer 5 Mechanic 1 Electrician 5 Mechanic 2 Electrician Supervision: Dealer or Komatsu Mining Germany 1 Mechanic 1 Electrician 1 Mechanic 1 Electrician Testing; Adjustment; Commissioning Komatsu Mining Germany 1 Service Engineer 1 Service Engineer Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Assembly Testing; Adjustment; Commissioning