Komatsu — 3) SLINGING OF CAB ASSEMBLY

8 [5] ASSEMBLY PROCEDURE (3 ) Installation of cab assembly (3) INSTALLATION OF CAB ASSEMBLY 1) Removal of floor frame undercovers (1 each on right and left sides, 1 on front side, and 3 each on upper and lower sides) 2) Removal of cover in cab assembly 1. Unpack the cab assembly and remove the right-hand cover. 2. Remove the 2 screws from the front plate. 3) Slinging of cab assembly 1. Sling the cab assembly with a 25-ton crane. Sling: Chain sling of spring hook type (2,000 mm x 4 pieces) Precautions Special tools Necessary devices Name Q'ty Name Q'ty Crane (25 ton) 1 Chain sling (2,000 mm x 4 pieces) 1 Other remarks (3 )