5-101.bk Page 2 Friday, March 17, 2006 11:05 AM INSTALLATION Engine Installation into Vehicle Description Engine installation details vary from vehicle to vehicle. The following procedure provides general installation guidelines for MACK E7 engines. Obtain assistance when installing the engine. Be sure to watch for obstructions such as engine or chassis components, brackets, clamps or other components that may interfere with engine installation. It is good practice to steam-clean road grime, grease, and oil from the engine before service. Steam-cleaning the engine and engine compartment permits more detailed inspection and improved workmanship. 1.
Align engine with torque converter or clutch (as applicable) and install transmission bell housing to the flywheel housing capscrews. Torque to specification. Before beginning, make sure all equipment has been inspected for safety and is available for use. Place vehicle on a flat, level surface. Make sure area has ample work space. 2. Install engine mount capscrews to secure engine mounts to engine. Torque to specification. 3. Remove transmission jack from under transmission. 4. Install clutch linkage and bracket-retaining capscrews.
Newly designed torsional idler-gear assemblies are now available for servicing both 1:1 and 0.7:1 ratio Flywheel Power Take-Off (FWPTO) units in E7 engines equipped with a T200 series transmission and FWPTO. New assemblies feature a two-piece idler gear and torsion spring. 5. Install power-steering hoses and reservoir, if applicable. 6. Install hood rest crossmember(s), if applicable. 7. Install exhaust bracket to flywheel housing and exhaust clamp at turbocharger. The new torsional idler-gear assembly reduces spline wear on the FWPTO input (drive) gear. If the unit is removed for any reason: 8. Install starter. Connect wiring and cables. Inspect input gear splines for excessive wear. 9.
Install air cleaner housing, if required. If splines show excessive wear, disassemble the FWPTO far enough to gain access to idler-gear assembly. Refer to MACK Service Manual 10-901, Flywheel Power Take-Off. 10. Install all coolant tubes, ground straps, air lines, fuel lines, hydraulic hoses or tubes, throttle linkage and electrical wiring harnesses that were removed from engine during removal. Removing Engine from Engine Stand 1. Attach a suitable lifting device to lifting points on engine. On some E7 models, the machined V-band was replaced with a 3.5-inch push-on turbocharger discharge connection that is angled forward.
The remaining models use a 3-inch push-on connection directed 90 degrees outward from the center line of turbocharger. 2. Position and attach an engine hoist to lifting device; place tension on the device by operating hoist. 3. With lifting device supporting the engine weight, remove mounting capscrews from engine stand. Page 8-2 200 ENGINE INSTALLATION & TESTING