5-101.bk Page 3 Friday, March 17, 2006 11:05 AM a. Connect electrical connector to low- pressure cutout switch in A/C refrigerant line. A new S3B turbocharger with a 3.5-inch push-on compressor discharge has replaced the earlier S3B turbocharger with cast elbow required for V-band connection. You will need to know which type turbocharger is used on your engine when ordering replacement parts. b. Connect electrical connector to binary (cycling clutch) pressure switch on receiver/dryer. c. Connect A/C line at receiver/dryer. d. Connect A/C compressor discharge hose at connection near radiator support. 11. Connect tube to turbocharger and air cleaner assembly. 12.
Connect heater hoses and A/C refrigerant lines, if applicable, where attached at lower dash panel behind engine. e. Obtain A/C refrigerant recovery and recycling equipment (J 38750-A for R12 or J 39500-B for R134A), and recover A/C system refrigerant. 13. Install fan and fan clutch assembly. 26. Tighten clamps securing air intake tube to turbocharger and air filter. Install intake tube. 27. Install hood. Refer to Hood Installation procedures in the appropriate vehicle manual. Belts used on the same drive must be installed in matched sets. Refer to the Maintenance and Lubrication manual, TS494, for procedures and specifications. Filter Element Installation 14.
Install and adjust belts per specifications. 15. Install radiator using a lifting device and an assistant, if required. All filters and coolant conditioners must meet MACK specifications. Prime oil filters before installation using the correct specification engine oil. 16. Install retaining capscrews to radiator support mounts. 17. Install retaining capscrews to radiator support rods at radiator support. 1. Install a new air filter in air filter housing. 18. Install fastener to bracket that secures radiator fan air clutch solenoid valve to radiator support. 2. Install Centri-Max™ assembly. Be sure to use a new element and O-rings. 3.
Using an appropriate filter wrench such as J 29927, install oil filter elements and coolant conditioner element. 19. Locate engine coolant temperature sensor and connect electrical connector. Install sensor harness to radiator support. 20. Connect Chassis-Mounted Charge Air Cooler (CMCAC) outlet hose at cooler. Prime fuel filter elements before installation. Use only clean, MACK-specified, Grade 2D diesel fuel. 21. Connect CMCAC inlet hose at cooler. 22. Install clamps that retain coolant overflow tank and install tank. 23. Connect lower radiator hose to coolant inlet of oil cooler assembly. 4. Prime the PRIMARY fuel filter element (red) by filling with clean No. 2 fuel oil.
Do not fill filter through center hole; it must be filled using outer holes. Lubricate gasket with oil and install filter. 24. Connect upper radiator hose to engine coolant outlet fitting. 25. If vehicle is equipped with air conditioning: Page 8-3 200 ENGINE INSTALLATION & TESTING