Mack Trucks — 5-101.bk (EN)

5-101.bk Page 4 Friday, March 17, 2006 11:05 AM 5. Prime the SECONDARY fuel filter element (green) by filling with clean No. 2 fuel oil. Do not fill filter through center hole; it must be filled using outer holes. Lubricate gasket with oil and install filter. TURBOCHARGER 1. Disconnect turbocharger oil inlet line and pour approximately one pint (473 ml) of clean engine oil into line. This ensures that bearings are properly lubricated for initial start-up. FINAL PREPARATION 2. Reconnect oil line. Lubrication AIR INLET SYSTEM 1. Check the integrity of air inlet system.

A lubricating oil film coats rotating parts and bearings of an overhauled engine, but this may not provide sufficient lubrication when engine is started for the first time. The following briefly describes the recommended procedure for ensuring proper lubrication. 2. Inspect all piping, connections and the air cleaner element. Replace components as required. COOLING SYSTEM 1. Check cooling system. Make sure all plugs are installed and tight. Make sure thermostat is installed. Do not mix brands or types of lubricants. Chemical additives may be incompatible and may contribute to the formation of sludge, acid or hardening. 2. Fill system with recommended coolant.

To ensure that all air is purged from cooling system, remove a plug from top (or end) of coolant manifold during filling. This will eliminate any air that was trapped as a result of rapid filling. Usually there are various points on the engine where a pressure line may be tapped into, but if no other is apparent, the oil gauge line may be disconnected and pressure tank applied at that point. 3. Install a new coolant conditioner and fill with the recommended coolant mixture. 4. Check that all plugs and thermostat(s) are installed. ENGINE LUBRICATION SYSTEM (PRIMING) 1. Fill engine crankcase with EO-L engine oil. FUEL INJECTION PUMP (MECHANICALLY GOVERNED AND V-MAC ENGINES) 1.

Remove the TEM sensor or the 12-mm plug in the governor housing. MACK-specified EO-L engine lubricant is recommended. E7 series engine capacity is 33.5 quarts (32 liters). 2. Fill pump housing with 12 ounces (355 ml) of EO-L engine lubricant. 3. Reinstall TEM sensor or 12-mm plug. 2. Fill a pressure prelubricator (J 39258-A) with the recommended oil and connect pressure prelubricator to main oil gallery. Prime engine lubrication system with sufficient oil. Prelubing should be performed after new and used injection pumps are installed on the engine. 3. Remove oil level dipstick and check crankcase level. Add sufficient oil, if necessary, to bring it to the FULL mark on dipstick.

Do not overfill. Page 8-4 200 ENGINE INSTALLATION & TESTING