Komatsu — 20_201.pdf

TESTING AND ADJUSTING PREPARATIONS FOR TROUBLESHOOTING ELECTRICAL SYSTEM PREPARATIONS FOR TROUBLESHOOTING ELECTRICAL SYSTEM When diagnosing electric circuits related to the monitor panel and governor pump controller, first open up the connector portions in the following manner. 2. Governor pump controller The governor pump controller is installed un- der a cover behind the operator's seat. 1) Remove three caps (1) and then three securing bolts. When removing the caps, use of a thin flat-head screw driver is recommended. 2) Take off cover (2). 1. Monitor panel 1) Take off cover (1). The cover is fixed with two upper and lower clips. Pull it up for the removal.

If a sunlight sensor is equipped for an air conditioner, detach P15 connector at the cover rear side. 3) Insert or connect a T-adapter for diagnosis with C01 , C02 and C03 connectors of gov- ernor pump controller (3). The connectors are fixed with screws. Loosen the screws and detach the con- nectors. When putting the connectors back into position, tighten them to the specified torque. 3 Screw: 2.82 Nm{0.288 kgm} 2) Remove three securing screws and take monitor panel (2) off the mount. Be careful not to let fall the securing screws inside the console. 3) Insert or connect a T-adaptor for diagnosis with P01 , P02 and P70 (multi-monitor only) connectors. PC210/240-7K 20-171