Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika demonstrably meet with these documents. pracoviště. Za ъčelem snadnйho sestavenн vэše zmнněnэch dokumentů montбžnн firmou je uveden v tomto manuбlu: Ш Popis a nбvaznosti pracн vykonбvanэch při With the view of the easy making by the assembly firm the documents mentioned above, is introduce in this manual: Ш Description and sequences of the carried out works during standard duration of the steam turbine assembly on the workplace (“Assembly description for making of the Technological procedure” – in the introduction of chapter 2.1.1).
In this document are marked work period milestones where is necessary to make a correction of procuration OHS, FP & Ecology on the work place. Ш The time schedule of the works carried out standardnнm průběhu montбže parnн turbнny na montбžnнm pracovišti („Popis montбže pro sestavenн Technologickйho postupu“ - v ъvodu kapitoly 2.1.1.). V tomto popisu jsou vyznačeny milnнky etap prбce , kde je nutno provйst ъpravu opatřenн BOZP, PO nebo OŽP na pracovišti.
Ш Harmonogram pracн vykonбvanэch při standardnнm průběhu montбže parnн turbнny na montбžnнm pracovišti (Typovэ harmonogram montбže parnн turbнny - kapitola 2.8.) při standardnнch podmнnkбch na pracovišti (Specifikace požadovanэch podmнnek pro montбž – kapitola 2.7.). Ш Specifikace rizik činnostн při montбži parnн during standard duration of the steam turbine assembly on the workplace (Standard time schedule of the steam turbine chap 2.8) with standard conditions on the workplace (Specification of required conditions for assembly chap 2.7).
Ш Specification of the activities risk during steam turbine assembly and their evaluation is in the text below turbнny a jejich vyhodnocenн je uvedeno v textu nнže. Date: 12.11.2013 Page 24 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ