NOTE: Be sure to measure each shim in shim pack (E) separately. The shims for setting rolling torque are not shown in the parts book. The part numbers are: 22 E 17 12. Put ring (21) in position on the pinion shaft. Put gear (15) in position in the housing assembly with the side that has a recessed hub next to ring (21). Put the pinion shaft in the housing assembly and through gear (15). 15. Remove tooling (E). Measure the thickness of tooling (E). Subtract from this thickness the recorded end play from step (14). This is the thickness of shims (23) that are needed with no bearing preload (actual gauge thickness measured end play = clearance). 13. Install ring (22). Install tooling (E).
Install bearing (17), the washer, lockwasher and nut (11). Tighten the nut to a torque of 15 to 34 N I m (11 to 25 lb I ft) while rotating the pinion. 16. In order to get bearing preload, subtract from the shim pack found in Step 15, 0.05 mm (.002 in). This is thickness of shims that need to be installed. 17. Install the correct thickness of shims (23), bearing cone (17), the washer, lockwasher and nut (11). Tighten the nut to a torque of 180 L 25 N I m (135 L 18 lb I ft) with tool (C) and lock within this range. 14. Install tooling (F) as shown, and measure the end play of pinion shaft (12). Record the measurement. Remove nut (11), the lockwasher, washer and bearing cone (17).
IDCD361S Power Train Disassembly & Assembly 43 PART NO. THICKNESS 924760 0.04 mm (.002 in) 924761 0.08 mm (.003 in) 924762 0.12 mm (.005 in) 924763 0.25 mm (.010 in) 924764 0.8 mm (.03 in) 924765 1.6 mm (.06 in)