Daewoo Heavy Industries B20S-2, B25S-2, B30S-2, BC20S-2, BC25S-2, BC30S-2 — Table of Contents

3 4 18. Check the rolling torque of the pinion as shown. It must be 0.85 to 1.70 N I m (7.5 to 15.0 lb I in). If the rolling torque is not correct, add or remove shims (23) until it is correct. Removal of shims (23) increases rolling torque. Adding shims (23) decreases the rolling torque. Record the actual rolling torque after the shims have been added or removed. Do not put the cap over the pinion nut yet. 21. Put bevel gear (4) on the carrier and the ten bolts. Tighten the bolts to a torque of 70 L 15 N I m (50 L 11 lb I ft). Put bearing cups (3) on the bearing cones. 1 2 5 6 7 9 22. Put the carrier assembly in position in the housing assembly. Install bearing caps (1) and the four bolts.

Tighten the bolts to a torque of 220 L 25 N I m (160 L 18 lb I ft). 8 19. If bearing cones (5) were removed, heat them to 135 ° C (275 ° F), and install them on the carrier. Put the thrust washers and axle gears (9) in position in the carrier. 23. Install the lockwasher and locknuts (2). Install tooling (F) as shown, and adjust locknuts (2) with tooling (A) until there is a backlash of 0.13 to 0.20 mm (.005 to .008 in). To adjust backlash, turn one locknut in and the other one out the same amount of turns. 20. Install the thrust washers, side gears (7) and pin (8). Install roll pin (6) through the carrier and pin (8). 24. Check the rolling torque again as shown in step 18.

Tighten locknuts (2) with tooling (A) equally to preload the bearings. Proper bearing preload will increase the recorded preload in Step 18 by 0.63 to 0.88 N I m (5.6 L 7.8 lb I in). 25. Measure backlash again. Bend a tab from each lockwasher into a slot of locknuts (2) to hold them in position. Power Train Disassembly & Assembly 44