Dig - 66 XT855 Operator’s Manual p Digging Multiple Trenches 1. Position unit in a central location to the intended digging paths. 2. Swing excavator and offset boom as needed to align with first digging path. 3. Fill and dump buckets. 4. Reposition excavator and boom as need to dig additional trenches. 5. When all trenches are finished, stow excavator, pivot seat to face tool carrier end, switch unit into tool carrier mode and drive away from area. CMW