Rear Engine Power Takeoff (REPTO) - Rebuilding (16-05) Section 16 - Mounting Adaptations - Group 16 M11 Page 16-16 Install the cover and four capscrews. Torque Value: 18 [14 ft-lb] Insert a new spacer ring into the bore of the idler gear. Push it in until it snaps into place in the center groove. Use Lubriplate 105 to lubricate the bearing outer races. Press the two new bearing outer races into the bore of the idler gear. The larger side of the taper must face toward the outside of the gear. NOTE: Do not interchange individual parts that make up the idler gear bearing assembly. Rebuild the idler gear with bearings that are packaged together.
Keep the two roller bearing assemblies and the spacer ring with the idler gear.