Removal and Installation of Cylinder Head 01.8 352/352 A 18 Attach coolant equalization tank with bracket. 19 Attach intake pipe. 20 Lower driver's cab, see 60.5-2.1/1 or 60.5-2.211. 21 Fill with coolant, check cooling system for leaks. For capacities see 1.3/2. Note: The equalization tank should be two-thirds fill. Important! Upon completion of the installation, warm up engine, loosen each nut individually in sequence shown in the tightening diagram and then finally tighten to a torque of 110 Nm. On no account must all nuts be loosened simultaneously before final torque is applied. Readjust valve clearance. After 500 km, retighten the cylinder head nuts and readjust the valves.
UKD 30 402 21 42-03 4.1/9