z With the snap ring plier, insert the snap rings of the piston pin. z With confirming the upper side indication of piston ring, after assembling the ring in the piston ring groove, inspect if the movement of ring is smooth. z Arrange the assembled piston in order as the cylinder number. 7) Water temperature inspection z Inspect the wax case and spring for any damage. Bar z With putting the water temperature gauge into water and heating the Thermometer water at the indirect method, when the water temp reaches to 71 ° C, the Wood plate valve begin to open and fully open z Measure the valve opening when it reaches to 85 ° C.
EFM2055I temperature and the valve full opening temperature and inspect if the valve lift is more than 8 mm and if abnormal, replace it 8) Injection nozzle z Set the nozzle assembly between the vise holder and disassemble it. z Remove the nozzle nuts and disassemble the inner parts. 1 Nozzle holder body 2 3 Cap nut Adjusting shim 4 Compression spring 5 Spindle 6 Spacer 7 Nozzle nut 8 Nozzle EFM2054I Inspection - 79 -