Doosan P158LE, P180LE, P222LE, PU158TI, PU180TI, PU222TI — 3.3. Engine Reassembly

3.3.30. Turbo charger z Attach a gasket to the exhaust elbow and assemble the turbocharger with fixing bolts. z Install the connecting pipes and an O-ring between the inlet flange and turbocharger Then, it is assembled with the O-ring that was coated with engine oil. z Attach a gasket on the oil supply pipe EFM2086I and assemble the pipe with the fixing bolts. z Attack a gasket on the oil discharge pipe and assemble the pipe by tightening the bolts. z At the same method as above, both sides are assembled. 3.3.31. Intake stake z Connect rubber hoses between the intake stake and turbocharger and assemble by tightening clamps. 3.3.32.

Fuel injection pipe z Connect the fuel injection pipes to the fuel injection pump and the nozzle respectively and then assemble them z Assemble the fuel return pipes by by tightening nuts. tightening fixing nuts. EFM2087I Engine Reassembly - 96 -