everyspec.com n/a — MIL-HDBK-502: Department of Defense Acquisition Logistics Handbook PDF Download (EN)

Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS 3. MIL-PRF-49506, LMI, is not intended to specify, define, or imply a requirement for contractors to establish or maintain any logistic database. 4. Electronic data interchange, on-line access, and all other automation issues are outside the scope of the specification and must be addressed separately using other appropriate documents such as MIL-STD-1840. 5. Information summaries are only examples of support information that DoD managers may want to request from contractors.

These sample summaries are not all inclusive or exclusive and are intentionally stated in general terms to encourage maximum contractor flexibility. Project offices can tailor samples to fit their information needs. 6. Contractors are strongly encouraged to offer support and support related engineering data to the government in their own commercial formats if the data is readily available and can cost- effectively meet DoD’s needs. 7. MIL-PRF-49506, LMI, contains verification criteria based strictly upon performance. 8. The LMI specification may be tailored down or tailored up (see summary worksheet example, Figure 7-11).

7.2.1 Guidance from DoD 5000.2-R The following paragraphs discuss provisions of DoD 5000.2-R that relate to the execution of MIL-PRF-49506, LMI. The first few paragraphs touch on not imposing government-unique requirements and on issues related to digital data. To paraphrase paragraph 3.3.4.2: The government shall avoid imposing government-unique requirements that significantly increase industry compliance costs.

Examples of practices designed to accomplish this direction include the open systems approach (one that emphasizes commercially supported practices, products, specifications, and standards); and replacement of government-unique management and manufacturing systems with common, facility-wide systems. Furthermore, paragraph 3.3.4.5 states , “Beginning in FY97, all new contracts shall require on-line access to, or delivery of, their programmatic and technical data in digital form, unless analysis shows that life-cycle time or life-cycle costs would be increased by doing so.

Preference shall be given to on-line access to contractor developed data through contractor information services rather than data delivery. No on- going contract, including negotiated or priced options, shall be re- 7-3