EM630/TC6A Closed-Loop Vector Hoist Inverter User Manual Figure 2–6 Assemble the Top and Bottom Mounting Holes Installation of EM630 inverter (below 22 kW): as shown in Figure 2–7, insert the left and right accessories for flush mounting into the slots at the left and right sides of the plastic shell, and tighten the two front and back screws. See Figure 2–8 Installation Dimensions for Flush Mounting and Table 2–3 for Installation dimensions. Tighten These Two Screws Flush Mounting Parts Installed Into the Plastic Shell Slots at Both Sides Figure 2–7 Left and Right Accessories for Flush Mounting 24