Downloaded from https://www.everyspec.com Headquarters Department of the Army Washington, DC 15 April 1994 *Department of the Army Pamphlet 700–28 Logistics Integrated Logistic Support Program Assessment Issues and Criteria (ILS) program status at key decision mile- stones in the materiel acquisition process. Is- s u e s a n d c r i t e r i a a r e i n c l u d e d t o a s s i s t i n assessing the adequacy of ILS planning for developmental, nondevelopmental, and mate- riel change systems and those systems being displaced by the new or improved systems. The guidance is for use in conjunction with AR 700–127. Applicability. This pamphlet applies to the Active Army, Army National Guard, and U.
S. Army Reserve. It specifically applies to the logistician, materiel developers, combat developers, trainers, independent evaluators, u s e r s , p r o g r a m e x e c u t i v e o f f i c e r s / p r o g r a m managers, and HQDA staff elements respon- sible for accomplishing or assessing the ade- quacy of one or more ILS program elements. P r o p o n e n t a n d e x c e p t i o n a u t h o r i t y . The proponent for this pamphlet is the Dep- uty Chief of Staff for Logistics (DCSLOG). The DCSLOG has the authority to approve exceptions to this pamphlet.
The DCSLOG may delegate this authority in writing, to a d i v i s i o n c h i e f u n d e r D C S L O G s u p e r v i s i o n within the proponent agency in the grade of colonel or the civilian equivalent. Interim changes. Interim changes to this pamphlet are not official unless they are au- thenticated by The Administrative Assistant t o t h e S e c r e t a r y o f t h e A r m y . U s e r s w i l l destroy interim changes on their expiration dates unless sooner superseded or rescinded. Suggested Improvements.
Users are in- vited to send comments and suggested im- p r o v e m e n t s o n D A F o r m 2 0 2 8 (Recommended Changes to Publications and B l a n k F o r m s ) d i r e c t l y t o H Q D A , A T T N : DALO–SMM, WASH DC 20310–0500. History. This UPDATE printing publishes a revision of this pamphlet. This publication has been reorganized to make it compatible with the Army publishing database. No content has been changed. Summary. This pamphlet provides guidance for assessing the integrated logistic support Distribution.
Distribution of this publica- tion is made in accordance with the require- ments of DA Form 12–09–E, block number 2557, intended for command level D for Ac- tive Army, Army National Guard, and E for U.S. Army Reserve.
Contents (Listed by paragraph and page number) Section II Maintenance Planning, page 15 General • 2–4, page 15 Other maintenance considerations • 2–5, page 15 Chapter 1 Introduction, page 1 Purpose • 1–1, page 1 References • 1–2, page 1 Explanation of abbreviations and terms • 1–3, page 1 Target audience • 1–4, page 1 Assessment progression • 1–5, page 1 Application guidelines • 1–6, page 1 Additional assessment considerations • 1–7, page 2 Manpower and personnel integration (MANPRINT) • 1–8, page 2 Environmental planning • 1–9, page 2 Replaced and displaced systems • 1–10, page 2 Section III Manpower and Personnel, page 16 Operator/Crew • 2–6, page 16 Maintenance • 2–7, page 16 Supply • 2–8, page 16 Transportation—vehicle operators • 2–9, page 16 Analysis Documentation • 2–10, page 17 Section IV Supply Support, page 17 General • 2–11, page 17 Planning documentation—provisioning plan • 2–12, page 17 Chapter 2 Milestone I Decision Review Issues/Criteria, page 15 Section V Packaging, Handling, and Storage(P,H&S), page 17 General • 2–13, page 17 Packaging • 2–14, page 17 Handling and storage • 2–15, page 18 Security • 2–16, page 18 Section I Design Influence, page 15 Safety and health hazard assessment • 2–1, page 15 Energy efficiency • 2–2, page 15 Other design parameters • 2–3, page 15 *This pamphlet supersedes DA Pam 700–28, 4 September 1987.
DA PAM 700–28 • 15 April 1994 i Unclassified