Downloaded from https://www.everyspec.com Contents—Continued Availability and system readiness objective • 5–42, page 77 Maintainability • 5–43, page 77 Maintenance • 6–24, page 86 Ancillary operational equipment • 6–25, page 88 Section XIII Support Management and Analysis, page 78 Support management • 5–44, page 78 Support analysis • 5–45, page 78 Section VII Training and Training Devices, page 88 General • 6–26, page 88 Institutional training • 6–27, page 88 Unit training • 6–28, page 89 NET • 6–29, page 90 Planning documentation • 6–30, page 90 Section XIV Cost Analysis and Funding, page 78 Logistics–related operation • 5–46, page 78 Logistics–related support • 5–47, page 78 Section VIII Technical Data, page 90 Equipment manuals • 6–31, page 90 Authorization documents for using units and support units • 6–32, page 92 Drawings • 6–33, page 92 Section XV Materiel Fielding Planning, page 78 Developer • 5–48, page 78 Gaining commands—MSP • 5–49, page 79 Section XVI Environmental Planning, page 79 Environmental documentation and materiel fielding • 5–50, page 79 Not Used • 5–51, page 79 Section IX Computer Resources Support, page 92 General • 6–34, page 92 System or end item operation • 6–35, page 92 System or end item maintenance • 6–36, page 92 Post–deployment software support (PDSS) • 6–37, page 93 Management planning • 6–38, page 93 Chapter 6 Milestone I/II Decision Review Issues/Criteria for NDI Adaptation or Integration, page 79 Section X Transportation and Transportability, page 93 Mobility—strategic and tactical • 6–39, page 93 Transportability • 6–40, page 93 Transportability report and engineering analysis • 6–41, page 95 Section I Design Influence, page 79 General • 6–1, page 79 Safety and health hazard assessment • 6–2, page 79 Energy efficiency • 6–3, page 80 Other design parameters • 6–4, page 80 Section XI Facilities, page 95 Base operations and services support • 6–42, page 95 Logistical • 6–43, page 95 Training • 6–44, page 97 Planning documentation—support facility annex • 6–45, page 97 Section II Maintenance Planning, page 80 General • 6–5, page 80 Unit/AVUM level • 6–6, page 80 DS and GS (AVIM) levels • 6–7, page 81 Depot level • 6–8, page 81 Section XII Standardization and Interoperability, page 97 General • 6–46, page 97 Command, Control, and Communications (CCC) • 6–47, page 98 Battlefield surveillance and target designation and acquisition systems • 6–48, page 98 Ammunition • 6–49, page 98 POL • 6–50, page 98 Components and repair parts • 6–51, page 98 Aircraft servicing • 6–52, page 99 Section III Manpower and Personnel, page 81 General • 6–9, page 81 Operator/Crew • 6–10, page 81 Maintenance • 6–11, page 81 Supply • 6–12, page 82 Transportation—vehicle operators • 6–13, page 82 Analysis documentation • 6–14, page 83 Section IV Supply Support, page 83 General • 6–15, page 83 Retail • 6–16, page 84 Wholesale • 6–17, page 85 Planning documentation—provisioning plan (PP) • 6–18, page 85 Section XIII Reliability, Availability, and Maintainability, page 99 Reliability • 6–53, page 99 Availability and system readiness objective • 6–54, page 100 Maintainability • 6–55, page 100 Section XIV Support Management and Analysis, page 101 Support management • 6–56, page 101 Support analysis • 6–57, page 103 Section V Packaging, Handling, and Storage, page 85 Packaging • 6–19, page 85 Handling and Storage • 6–20, page 85 Security • 6–21, page 86 Section XV Cost Analysis and Funding, page 104 Logistics–related research and development • 6–58, page 104 Logistics–related investment—procurement • 6–59, page 104 Cost analysis documentation • 6–60, page 104 Section VI Support Equipment and TMDE, page 86 General • 6–22, page 86 Supply • 6–23, page 86 Section XVI Materiel Fielding Planning, page 104 v DA PAM 700–28 • 15 April 1994