Pneumatic Actuator Durastroke Series 1300 – 1350 Installation & Maintenance Instructions INSTALLATION Installation of Airtech Products Durastroke pneumatic actuator is a simple three-step process; Mounting of the actuator & attachment to load, connection of air line and connection of the control signal. Before starting installation, inspect the actuator and contents of the shipping carton to ensure all required parts are present. Check the following:  Ensure all parts are firmly secured to the mounting plate and the mounting plate is firmly secured to the actuator body.  Clevis is present at the end of travel stem?  The following hardware kit was included: 1.

Five (5) 3/8-16 x 1 Ѕ” long bolts 2. Four (4) 3/8” lock washers 3. One (1) 3/8-16 locking nut A) Mounting The Actuator: 1. The actuator can be mounted in either a vertical or horizontal position. 2. The actuator is supplied with four (4) 3/8”-16 bolt-holes in the bottom plate for attachment to a mounting plate or bracket. 3. A hole at least 13/16” (but not larger than 1” diameter) must be provided in the center of the actuator mounting bolthole pattern for penetration of the actuator travel stem and clevis. 4. Attach the actuator to the mounting bracket with the four supplied 3/8”-16 x 1Ѕ ” bolts and lock washers. In a rotating pattern, tighten each to 16 Ft-Lbs torque. 5.

DO NOT ATTACH THE ACTUATOR TO THE TORQUE TUBE LEVER ARM YET. B) Air Line Connections: 1. Blow out all piping before connections are made to prevent dirt, chips, etc from entering the positioner. Ensure all air entering the positioner and actuator is clean, dry and oil free. Failure to do so increases the possibility of operational problems and/or deviation from specified performance. 2. Locate the 1/4” NPT ports labeled, “Supply” and “instrument” on the Siemens 73N12F positioner. 3. Install a 1/4” threaded adapter in the air inlet ports and use Teflon tape or non-hardening sealant on threads of male connectors. 4.

As appropriate, connect 1/4” or 3/8” air-line to the Supply and Instrument ports on the positioner. The supply line is “Plant Air” reduced to no more than 50 psi. The Instrument air is plumbed directly off the output of the I/P transducer. 1550 S. 81 st W. Avenue  Tulsa, OK 74127 Office: 918-241-0264  www.airtechproducts.com

Стр. 1

D) Connecting The Linkage: 1. In most cases**, the torque tube lever arm will be preset at the factory to drive the louver either “Fail Open” or “Fail Closed” upon loss of air and / or actuator retraction. As a result, connection of the linkage will be a simple matter of manually situating the louver blades and actuator stem to the correct position and then attaching the control link to the clevis (at the base of the actuator stem) and finally to the torque tube lever arm. To determine how the actuator and louver blades should be positioned, please note the following instructions: a.

“Fail Open” Louvers  Stroke actuator to fully extended and manually set louver to fully closed position before connecting louver lever arm & link to actuator clevis. b. “Fail Closed” Louvers  Ensure actuator is completely retracted and manually set louvers to fully closed position before connecting louver lever arm & link to actuator clevis. 2. When all sections are installed and connected, stroke the actuator several times to ensure it moves the entire louver freely without binding or interference. On very large louvers with multiple sections, inspect to confirm all the sections are fully open and completely closing in unison.

Some adjustment of end links or torque tube clamps may be required to ensure all louver blades open and shut consistently down the entire length or across the entire width of the louver. 3. Check all attachment fasteners to ensure all are properly tightened and completely engaged to the louver flange. 4. If applicable, check all end link connections and torque tube couplers to ensure they are properly tightened and fasteners are completely engaged. **For new orders only when the actuator is purchased in conjunction w/louvers.

Please contact the factory for specific instructions on retrofit or other applications that did not see both the actuator and louver originate as simultaneous/concurrent Airtech orders

Стр. 2

MAINTENANCE Annual Inspection: 1. Inspect and verify all mechanical connections  Actuator bolting to mounting plate or bracket o Check mounting plate or bracket rigidity o Confirm actuator to mounting bracket bolt tightness  Clevis general condition o Visually inspect overall clevis condition o Confirm fastener between clevis and actuator link is sound  Link to torque tube lever arm o Visually inspect overall link condition o Confirm fastener between link and torque tube lever arm is sound  Positioner attachment to actuator body o Visually inspect positioner for visible cracks or damage o Confirm positioner is securely fastened to actuator body 2.

Inspect and verify all pneumatic and electrical connections  Air connections to filter regulators o Supply line to threaded adapters o Adapters to filter regulators  Diaphragm o Confirm 50 psig air at Positioner Supply Port  Listen for leaks at stem  Positioner o Confirm 3 – 15 psig at instrument air port  Confirm louver operation in response to proportioned air Repair Kit & Recommended Spare Parts List The following items are recommended as a single actuator repair kit. It is suggested that one repair kit be kept on hand for each 3 actuators on site and in service.

Please note a repair & maintenance kit is not offered for the positioner because of the complexity of that particular item. Best practice is simply to replace a non-operational positioner. Item numbers noted below refer to Airtech Products, Inc. drawing, “Durastroke 1500 Actuator”. Item Number Description 2 Guide Bushing 4 Snap Ring 9 Diaphragm 13 Diaphragm Washer 15 O-Ring 23/24/25 Kit, Positioner, Std Duty 10-10-18