U.S. Department of Defense MIL-STD-810D — vdj6225.tmp (EN)

Downloaded from https://www.everyspec.com MIL-STD-81OD 19 JuIY.1983 II-3 IWCERU@ II-3.1 ~. Written step-by,-stepprocedures shall be prepared as called out in the test plan. II-3.2 Droce-. The following operations should be considered as candidates for written procedures: a. Pre-teat visual inspection and checkout b. Mounting and connection of teat unita in the chamber. w I c. Calibration of instruments and apparatua. d. Functional testing of the store(s). Controlling the teat cycle environments. Post-test operations. 11-4 ~ 11-4.1 ~. The test information to be recorded shall”be included in the test plan. 11-4.2 formation to be reoorded 11-4.2.1 For each test cycle, starting with number 1: a.

starting and ending times b. any deviations from specified time’limits or environmental or alternately, preservation of all continuous environment response patterns, records c. operators on duty d. pertinent comments II-4.2.2 I@ item information. For each item under test: a. specific identification b. results of pre-test inspection and”checkOut c. position occupied in test chamber, if more than one used G d. time’when item installed in chamber and number of the test encountered cycle first MSTHOD 523.0 19 July ,1983 523.0-18