U.S. Department of Defense MIL-STD-810D — vdj6225.tmp (EN)

Downloaded from https://www.everyspec.com . MIL-STD-81OD”’ 19 July 1983 e. time when item removed f~om ohamber and test cycle number last encountered .,,. f. reason for removal results of post-test inspection and checkout h. disposition of item II-4.2.3 Information for ~ minu items a. time non-conformance was noted and number.of teat cycle in or after which it was discovered b. evidence indicating non-conformance c. confirmation of failure if failure suspected and explanation of how it wss confirmed d. failure analysis and diagnoais e. disposition of item f. failure report number g. names of operators providing the above information 1.9‘July.1983 523.0-19 METHOD 523.0 .