omron — Testing the project

Tutorial: Building a Simple Project 8. In the Maximum Value box, type 3 . 9. Close the Object Properties dialog. Configuring the "Tank" text input 10.Go to File , and then select Save . This figure shows how your screen should look after you've created the tank selector object. Finished tank selector object during run time Testing the project This part of the tutorial shows how to test the project again with the animated tank, the level slider, and the tank selector. 1. Go to File , and then select Close All . All open worksheets are closed. 2. On the Home tab of the ribbon, in the Local Management group, click Run . The project runs and the startup screen is displayed. 3.

Click the button to open the synoptic screen. The synoptic screen is displayed. 4. Type the tank number (1, 2, or 3) in the Tank label, and then use the slider to adjust the tank level. Note that you can view/adjust the level of each tank independently. 5. Click the exit icon to shut down the project. If any part of the project does not work as expected, switch back to the development application ( ALT+TAB ) and then click Stop on the Home tab of the ribbon. Page 73