Downloaded from https://www.everyspec.com MIL-HDBK-683(AT) 4.7.5 ~ct de~ . . The Project Detailed PlarAshould specify the following: a- Identification, name and description of the process b. Characteristics to be measured (variable or attribute) c- Production d. Number of redundant tools, machines, or statiom e. Production rate per hour f. Number of shifts g- Number of o~ratora h. Inspections, include the following: (1) Number of inspection gages (2) Variable of attribute characteristics (3) Number of inspectors (4) Number of shifts (5) Inspection time and unit (6) Time difference between production and inspection of the part i. Charts, include the following:
(1) Type of the chart selected (2) Number of charts to be used (3) Location of chaste to be Postd 4.7-6 ~. The management stmcture should include an organization chart which reflects the responsibilities to implement and sustain SPC. Each level should be supported by a section for roles and responsibilities. Names of the Presidents Quality Council; steering committees, and team leadera should be identified. A canpeny Proce88 Control Procedure should be available which reflects responsibilities for all the actions relative to implementing and sustaining SPC. This procedure should be customized for each process, however, many will be identical.
The contents of the organization chart should specify the following: 33