MIL MIL-HDBK-683(AT) — MIL-HDBK-683(AT) Statistical Process Control (SPC) Handbook - Implementation & Evaluation PDF (EN)

Downloaded from https://www.everyspec.com MIL-HD3K-683(AT) a. perforM tk inspectiom b. k?hO posts control charts establishes and updates control limits d. hhO c. responds on out-of-control conditions e. provides corrective and preventive action f. Who audit8 the process 4.7-7 ~ . The training plan should include the following: a. The content of training by level of participants b. Ths numbsr of seminar hours c. The sample of handout material d. The mode of training e. Q=lifications of instructor f. The location of training g- The number of hours on-job-training (OJT) h. OJT by whom and qualifications i. Ths testing to assure competence 4.7.8 .

Supplier controls require the supplier, vendor, or the subcontractor to have SPC on all critical and major characteriatica. The suppliers are required to submit a copy of the process control chart for each process with WC along with a certification of “lot integrity”’ indicating the parts were produced under the process control chart that was sutmitti. What are the auditing techniques to assure the quality is the same level as indicated by the control charts. 4-7-9 ~- Since many atep8 ?j in applying SPC are common, the following systematic a~ch ia recommended. Y See reference, 9.4.a, for details to each step. 34