Supermicro SuperServer 6011L — Supermicro SuperServer 6011L User's Manual PDF (P3TDLR / SC810 1U Server) (EN)

S UPER S ERVER 6011L Manual Choosing a Setup Location: the front door completely (~25 inches). - Leave approximately 30 inches of clearance in the back of the rack - Leave enough clearance in front of the rack to enable you to open to allow for sufficient airflow and ease in servicing. ! ! Warnings and Precautions! Rack Precautions: extended to the floor with the full weight of the rack resting on them. - In single rack installation, stabilizers should be attached to the rack. - In multiple rack installations, the racks should be coupled together.

- Always make sure the rack is stable before extending a component - Ensure that the leveling jacks on the bottom of the rack are fully from the rack. - You should extend only one component at a time - extending two or more simultaneously may cause the rack to become unstable. Server Precautions: - Review the electrical and general safety precautions in Chapter 4. - Determine the placement of each component in the rack before you install the rails. - Install the heaviest server components on the bottom of the rack first, and then work up.

- Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure. - Allow the hot plug SCSI drives and power supply units to cool before touching them. - Always keep the rack's front door and all panels and components on the servers closed when not servicing to maintain proper cooling. 2-2