Unpacking and Inspecting the Unit Unpacking the Unit 1. Open the packaging. 2. Find the unit documentation. 3. Verify that the packaging contains all the accessories indicated on the list attached with the documentation. 4. Check that the hose length is correct before starting the installation. Checking can be carried out by consulting the “Packing List” included with the unit documentation. Inspecting the Unit 1. Open the condenser unit cover and ensure the following: Neither the cover nor the unit should show any shock damage or imperfections. The condenser unit should be charged with helium gas. The voltage of all the electrical components is correct (12/24V). 2.
Open the evaporator unit cover and make the following checks: Neither the cover nor the unit should show any shock damage or imperfections. The evaporator unit should be charged with helium gas. The voltage of all the electrical components is correct (12/24V). TK 56881-18-IM-EN 9