22/24 T RAKKER E URO 4/5 GEARBOXESZF 16 S 1620 T.D. - 2220 T.D. - 2520 T.O. B 61203 Print 603.93.641/A Revi - June 2007 Figure 6/100 1027 Put primary shaft (1) upside down. 82 ry s 83 s: e Figure 6/102 10 Mount, on primary shaft (1), spacer ring (3). Heat bushing (2) at 120ºC and mount it on primary shaft ( Mount: - synchroniser ring (10) in such a way that its projectio are positioned into hub (4) seats; - coupling body (9); - gear of IV gear (7), complete with roller bearings (6 a 8); - spacer ring (5). Adjusting the main shaft Figure 6/103 6 Determine rib ring thickness for gear of IV gear, operating below.
Measure the distance A between the end ofthe shaft (1) a the seat (2) supporting the tapered roller bearing. Mount the thrust washer (3) and measure the distance between this and the end of the main shaft (1). The difference A - B must be between +0.07 and -0.08 m If a different valueis found,replace rib ring (3) by another o having suitable thickness. NOTE For the operation, use tool 99370449. Mount, on primary shaft (1): - lubricated needle bearing (2); - gear of III gear (6); - coupling body (5); - synchroniser ring (4). Heat hub (3) at 120 ºC temperature and mount it on prima shaft (1), paying attention that synchroniser ring projection are correctly positioned into hub (3) seats.
Check that gear (6) axial clearance is 0.2 mm. Figure 6/101 1027 Mount sliding sleeve (2) on hub (1). Fit, into hub (1) seat springs (3) and pins (4) adjusting them under sliding sleev (2).