HP — 2.2 Replacing the intermediate conveyance roller (sponge roller)

Q5686A/Q5687A DISASSEMBLY/ASSEMBLY 2.2 Replacing the intermediate conveyance roller (sponge roller) A. Periodically replaced parts/cycle • Intermediate conveyance roller (sponge roller): Every 250,000 copies. Note: • When replacing the intermediate conveyance rollers, all of the 2 pairs (4 components) must be replaced. B. Procedure 1. Open the finisher door. 2. Remove 2 screws [1] and a bearing [2], and then remove the intermediate conveyance roller [3]. III DIS./ASSEMBLY [2] [1] [3] 3. With a driver inserted into the groove of the [1] sponge roller [1], prize it open to remove the sponge roller. 3-9