A+ Server 4020A-8R User's Manual Choosing a Setup Location - Leave enough clearance in front of the system to enable you to open the front door completely (~25 inches). - Leave approximately 30 inches of clearance in the back of the system to allow for suffi cient airfl ow and ease in servicing. - This product is for installation in a Restricted Access Location only (dedicated equipment rooms, service closets, etc.) ! ! Warnings and Precautions! Rack Precautions - Ensure that the leveling jacks on the bottom of the rack are fully extended to the fl oor with the full weight of the rack resting on them. - In single rack installation, stabilizers should be attached to the rack.
- In multiple rack installations, the racks should be coupled together. - Always make sure the rack is stable before extending a component from the rack. - You should extend only one component at a time - extending two or more simul- taneously may cause the rack to become unstable. Server Precautions - Review the electrical and general safety precautions in Chapter 4. - Determine the placement of each component in the rack before you install the rails. - Install the heaviest server components on the bottom of the rack fi rst, and then work up.
- Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure. - Allow the hot plug SCSI drives and power supply units to cool before touching them. - Always keep the rack's front door and all panels and components on the servers closed when not servicing to maintain proper cooling. 2-2