Belt Calibrations 5. Optionally, edit the Process Strategy, as needed. For details, see Process Strategies on page 878. 6. Optionally, edit the Control Sources, as needed. For details, see Control Sources on page 869. 7. Teach the Process. For details, see Teaching a Process on page 894. 8. Optionally, edit the Configuration Items, as needed. For details, see Configuration Items on page 856. 9. Add a second Process manager object for oranges. It could be named "Orange Packing". 10. Add a new Part and/or Part Target, if the pick or place requirements are different than those for apples.
The Part and/or Pat Target must use the same robot, sensor and belt objects that were used with the apple-packaging process. 11. Optionally, edit the Process Strategy and Control Sources, as needed. 12. If a new Part and/or Part Target was added for oranges, teach the Process. 13. Optionally, edit the Configuration Items, as needed. 14. Repeat steps 9 - 13 for peaches. NOTE: In the future, to add additional fruits, simply repeat steps 9 - 13 for each new fruit that you wish to add to the workspace. 15. Optionally, use the User Interface Designer to create an operator interface that provides easy selec- tion of the desired fruit-packing process.
For more details on the User Interface Builder, see User Interface Designer on page 1000. Belt Calibrations This section describes the Belt Calibrations group in the Process Manager. For details, see Process Manager on page 843. The Belt Calibrations group defines the robot-to-conveyor calibrations for the selected workcell process. For more details on defining a workcell process, see Processes on page 886 . Belt Calibrations Group Each of the items in the Belt Calibrations group is described in the following table: ACE User's Guide, 3.6.x 18316-000 Rev A Page 848