Yanmar — Draining and Refilling Closed Cooling System (Engine Coolant)

PERIODIC MAINTENANCE Periodic Maintenance Procedures 6. Install cylinder block drain plug with a new gasket. 12. Install the pressure cap and tighten firmly. WARNING! Burn Hazard. ALWAYS tighten the filler cap securely after checking the coolant level. Steam can escape during engine operation if the cap is loose. 7. Install heat exchanger. Ensure the drain cock (Figure 4-12, (1)) on the heat exchanger is closed. Figure 4-12 (2) (1) 13. Remove the coolant recovery tank cap and fill with coolant mix to approximately 50 mm (2 in.) below the full line. Replace cap. Never fill to the full line. 14.

After filling an empty cooling system, test-run the engine for about five minutes and check the engine coolant level at the recovery tank again. 0006644 Figure 4-12 8. Remove the pressure cap (Figure 4-12, (2)) from the heat exchanger. 9. Inspect the cap gasket and flange on the filler neck for damage. Replace if necessary. 10. Check the rubber hose connecting the coolant recovery tank to the heat exchanger. Be sure the hose is securely connected and there is no damage. 11. Pour coolant mix slowly into the heat exchanger to prevent the formation of air pockets. Fill until the heat exchanger is completely full. NOTICE: Only use the engine coolant specified.

Other engine coolants may affect warranty coverage, cause an internal buildup of rust and scale and / or shorten engine life. Prevent dirt and debris from contaminating engine coolant. Carefully clean the filler cap and the surrounding area before you remove the cap. NEVER mix different types of engine coolants. This may adversely affect the properties of the engine coolant. 4-16 BY Service Manual © 2009 Yanmar Marine International