SECTION 3 MACHINE TRANSPORT AND STORAGE Page 10 MACHINE STORAGE NOTE: Be sure to oil or grease all linkage connections, joints, nuts, pins, shafts, and bushings not covered In the "SERVICE GUIDE". 10. Drain the engine oil from the crankcase and replace the engine lubricating oil filter. Refer to “ENGINE”, Section 5. 11. Install fully charged batteries. Refer to “ELECTRICAL SYSTEM”, Section 5. IMPORTANT: Check that the batteries are level in the holder and securely held. The hold-down fasteners should hold the batteries firmly but not tight enough to warp or damage either the hold- down bar or batteries. WARNING!

Battery cable shoes are arranged in a way that access to the battery plugs is ensured. Battery cables should not rub hold-down bars or its fasteners. Always connect the negative ground cable last to minimize the chance of sparks or explosion. 12. Start the engine, refer to “ENGINE START AFTER OIL CHANGE OR PROLONGED STANDSTILL”, Section 4. Observe all the gauges on the instrument panel for proper operation of the engine. WARNING! Never start an engine indoors unless proper exhaust ventilation is provided. Once the engine is running, move the machine outdoors as soon as possible. IMPORTANT:

Crank the engine for a period of 30 seconds then allow the cranking motor to cool for two or three minutes before cranking again to avoid damaging the cranking motor. TD-25H DRESSTA