SECTION 4 OPERATING Page 30 OPERATING MOUNTED EQUIPMENT PIN INSTALLATION Push the control lever to the left, position “I” to install the shank pin into the shank mounting hole. Simultaneous raising or pitching of the tooth will facilitate the installation of the pin. The control lever will return automatically to the hold position when released. 4.18. BLADE POSITIONS 4.18.1. BULLDOZER (D-2) BLADE POSITIONS 4.18.1.1. TILTING THE BLADE TILTING THE BLADE WITH MECHANICAL TILT 1. Raise the blade above the ground and shut off the engine. Refer to “STOPPING THE ENGINE”. 2. Remove the strut locking pin and adjust the upper strut on the side to be raised.
Extend the strut by the value equal approximately to half of required blade tilt. IMPORTANT: Do not expose any portion of the eyebolt threads. 3. Adjust the opposite side to get the desired tilt by shortening the strut by the value equal to the remaining part of desired tilt. Reinstall the locking pin. Fig. 4.25. Blade tilt 1. RH Tilt 2. LH Tilt TILTING THE BLADE WITH HYDRAULIC TILT Proceed as follows: 1. Raise the blade off the ground. 2. Hold the tilt control lever in the tilt position on the side to which the blade is to be tilted until the desired tilt is obtained. Maximum tilt is 500 [mm]. TD-25H DRESSTA