SECTION 4 OPERATING Page 34 OPERATING TECHNIQUES Fig. 4.30. Cutting Down a Pile or Hill 1. Method 1 2. Method 2 WARNING! Avoid high overhangs. Ramp up and remove the top layers first. Avoid high banks. Operate the machine as far away from the trench as possible or cave-in may result. A hillside cut can be started more easily if a small bench cut is first made as shown in Fig. 4.31. 1. Cut I 2. Cut II 3. Final level Fig. 4.31. Hillside Cut Then, when digging as in Fig. 4.32, keep the inside (uphill) surface slightly lower to gain greater tractor stability. Tilting the blade will provide this type of cut with less effort on the operator's part.
Always cut a shelf wide enough to provide solid support for equipment used later. If possible, move the material downhill to gain the advantage of gravity, reduced effort and increased tractor stability. Soft soil or shallow slopes may allow the side hill cut to be made as shown in Fig. 4.33. Increased stability is realized by running the uphill track inside the ridge left by the first cut. Cuts 3, 4 and 5 illustrate the completion of the shelf. TD-25H DRESSTA